Update v1.2: M200 Arad – Radna Route |Changelog & Fixes


Date: 16.03.2026
Update of product: #M200 Arad – Radna v1.2

Hello everyone!

The wait is officially over. We are pleased to announce the release of the #M200 Arad – Radna v1.2 update. Based on your detailed feedback and bug reports, our team has implemented a comprehensive list of fixes and optimizations.

Where to download: The updated version is available for download immediately. You can find v1.2 in your personal dashboard on our official website: https://poli-co.com/my-account/

We appreciate your continued support. Should you encounter any technical difficulties, please reach out to us at contact@poli-co.com or via the official contact form on our site.

We remain committed to providing the best experience for our community. See you on the rails of M200 v1.2.


🛠 Version 1.2 | Change Log

1. Licensing & System Optimization

  • Core System: Completely redesigned the Poli&Co licensing architecture for superior stability.
  • Installer Logic: Fixed automatic disc detection during setup. The installer now strictly follows user-defined installation paths without errors.
  • Drive Compatibility: Resolved specific issues related to D, E, and F drive assignments.
  • Stability: Eliminated desktop crashes (CTDs) caused by system software conflicts.
  • Performance: Optimized CPU frequency scaling and resolved license file conflicts.
  • Scenario Editor: Fixed conflicts during the creation/editing process and resolved crashes when moving scenario files.

2. Infrastructure & Signaling (Arad – Radna)

Arad Station & Surroundings

  • Level Crossing: Corrected vehicle crossing functionality; removed redundant barriers and synchronized operation.
  • Depot Entry: Fixed speed indicators at the Arad Depot entrance.
  • Arad Triaj Note: Regarding reports of a misplaced “cornfield asset,” our team was unable to reproduce this on any test machine. The cause remains unidentified at this time.
  • Arad – Glogovat: Updated the E68 highway bridge over the tracks to 2026 standards. Corrected signal aspects.

Glogovat Station

  • Signaling Overhaul: Full replacement of entry and exit signals with correct prototypical models.
  • Speed Profiles: Corrected speed limits for both arrival and departure.
  • Catenary: Fixed overhead contact wire alignment throughout the station.
  • Freight Lines: Adjusted speed parameters on both freight-specific lines.

Ghioroc Station

  • Entry/Exit Signals: Complete replacement of all signals from Paulis Hc and Glogovat directions.
  • Track Speeds: Synchronized speed limits for signals and tracks across all station lines.

Paulis Hc – Paulis

  • Level Crossing: Installed the latest high-fidelity barrier and crossing models.
  • Electrification: Refined and fixed the overhead contact network.
  • Paulis Station: Fixed entry/exit signaling from both directions. Adjusted “Marfa” freight line speed limits and turnout (switch) speeds.

Paulis – Radna

  • Level Crossing: Updated to the current standard barrier model.

Radna Station

  • Signal Correction: Resolved the reported right-track exit signal bug. The Indusi (PZB) system now operates correctly without triggering false braking.
  • Inductors: Replaced and correctly tuned the inductor for the main semaphore.
  • Traffic Flow: Fixed entry semaphores and “parcurs” signals from the Paulis direction.
  • Secondary Lines: Corrected entry semaphores for all secondary tracks.

Thank’s!

Warmly, your Poli&Co Team

contact@poli-co.com | poli-co.com

Leave a Reply

Your email address will not be published. Required fields are marked *

Generating License Ticket...